E²
Status timeline
- 28 Dec 2023Application received from the International Bureau (Madrid)Sn Assigned For Sect 66a Appl From Ib
- 22 Apr 2024Assigned to an examining attorneyAssigned To Examiner
- 27 Apr 2024Office action issuedNon-Final Action Written
- 29 Oct 2024Response to office action filedTeas Response To Office Action Received
- 9 Dec 2024Final refusal issuedFinal Refusal Written
- 28 May 2025Approved for publicationApproved For Pub - Principal Register
- 1 Jul 2025Published for oppositionPublished For Opposition
- 19 Aug 2025Registered on the Principal RegisterRegistered-Principal Register
All 34 USPTO events
| 2026-07-07 | Partial Invalidation Of Reg Ext Protection Created |
| 2025-12-05 | Limitation Of Goods Received From Ib |
| 2025-12-02 | Notice Of Updated Registration Confirmation Emailed |
| 2025-11-19 | Final Disposition Notice Created, To Be Sent To Ib |
| 2025-11-07 | Correction Under Section 7 - Processed |
| 2025-11-03 | Case Assigned To Post Registration Paralegal |
| 2025-08-22 | Teas Section 7 Request Received |
| 2025-08-19 | Registered-Principal Register |
| 2025-08-19 | Notice Of Registration Confirmation Emailed |
| 2025-07-01 | Published For Opposition |
| 2025-07-01 | Official Gazette Publication Confirmation E-Mailed |
| 2025-06-25 | Notification Of Notice Of Publication E-Mailed |
| 2025-06-13 | Notification Of Possible Opposition - Processed By Ib |
| 2025-05-28 | Approved For Pub - Principal Register |
| 2025-05-27 | Notification Of Possible Opposition Created, To Be Sent To Ib |
| 2025-05-27 | Teas Request For Reconsideration Received |
| 2025-05-27 | Correspondence Received In Law Office |
| 2025-05-27 | Teas/Email Correspondence Entered |
| 2025-05-27 | Notification Of Possible Opposition Sent To Ib |
| 2024-12-09 | Final Refusal Written |
| 2024-12-09 | Final Refusal E-Mailed |
| 2024-12-09 | Notification Of Final Refusal Emailed |
| 2024-10-29 | Teas Response To Office Action Received |
| 2024-10-29 | Correspondence Received In Law Office |
| 2024-10-29 | Teas/Email Correspondence Entered |
| 2024-05-28 | Refusal Processed By Ib |
| 2024-05-03 | Refusal Processed By Mpu |
| 2024-05-03 | Non-Final Action Mailed - Refusal Sent To Ib |
| 2024-04-28 | Non-Final Action (Ib Refusal) Prepared For Review |
| 2024-04-27 | Non-Final Action Written |
| 2024-04-22 | Assigned To Examiner |
| 2024-01-02 | Application Filing Receipt Mailed |
| 2023-12-29 | New Application Office Supplied Data Entered |
| 2023-12-28 | Sn Assigned For Sect 66a Appl From Ib |
Goods & services
Class 9 Software, electronics & scientific
Electric equipment and instruments namely, switches, time delays, interval and inverse circuits for heating, ventilating and air conditioning apparatus and installations, and systems constructed therefrom for filter monitoring or central control; manually operated or reference variable-dependent circuits in the nature of sensor-guided electronics for the control of heating, ventilating and air conditioning systems, in particular for the reference variables humidity, light, movement, temperature and gas levels and other variables affecting air quality, and other reference variables in the field of building technology, for the control of heating, ventilating and air conditioning systems; fire …
Class 11 Lighting, heating & appliances
Heating, ventilating and air conditioning apparatus and installations, in particular radial fans, outer wall air vents, overflow channels and structural components therefor and room ventilation systems consisting of the aforesaid apparatus
Class 37 Construction & repair
Installation, maintenance and repair of heating, ventilating and air conditioning apparatus and installations, fire protection devices and drive elements for opening windows, and data processing equipment therefor, data transmission apparatus, cables and cable network hardware, and automatic barrier devices to prevent the spread of fire in ventilation ducts, drive elements for opening windows and all parts therefor and control devices therefor
Class 42 Technology & SaaS
Engineering services, namely, design and technical consultancy with regard to the planning of fire protection devices and data processing equipment therefor, data transmission apparatus, cables and cable networks, and automatic barrier devices to prevent the spread of fire in ventilation ducts, drive elements for opening windows and all parts therefor and control devices therefor, being engineering services
Source & freshness
Source: USPTO Trademark Applications bulk data. This record was last updated by the USPTO file dated 7 Jul 2026; the index was built on 20 Nov 2026 and covers USPTO data through 31 Aug 2026. Open the official USPTO record (TSDR) → If the two differ, the USPTO record is correct.