Heads up: we show every live trademark, plus inactive ones from the last 5 years, in the United States, Singapore, Canada, Australia and France. India is looked up live when you search, so it is not a saved copy of every mark, and it can be busy some days. Data is only as fresh as each country publishes it, and some countries aren’t included yet, so a brand can be registered even if it doesn’t show here. Always check the official record before you use a name. This is not legal advice.
VECTOR POWER
Non-Final Action - Mailed
Show more
Class 37: Construction of high-voltage substations, low and medium-voltage controls and distribution, power houses, and switchgear in the electrical, utilities, industrials, renewables, and data center industries; installation of infrastructure for the transmission and distribution of electricity and electrical energy, electrical apparatus, cables, and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; maintenance of infrastructure for the transmission and distribution of electricity and electrical energy, electrical apparatus, cables, and electricity and electrical energy distribution and transmi…
Class 41: Educational services, namely, providing training in the fields of infrastructure and equipment engineering, testing, construction, installation, maintenance, and repair in the electrical, utilities, industrials, renewables, and data center industries; Educational services, namely, providing safety training in the fields of infrastructure and equipment engineering, testing, construction, installation, maintenance, and repair in the electrical, utilities, industrials, renewables, and data center industries.
Class 42: Testing, monitoring, and inspection of infrastructure for the transmission and distribution of electricity and electrical energy and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; Testing of apparatus in the field of electrical engineering; Scientific testing and analysis in the nature of thermography testing and analysis services, namely, electrical-system testing services of others using thermography; Design, engineering, research, development, consulting, analysis, and testing of infrastructure for the transmission and distribution of electricity and electrical energy and electric…
Class 37 – Construction & repairClass 41 – Education & entertainmentClass 42 – Technology & SaaS
Status timeline
- 18 Nov 2024Application filedNew Application Entered
- 24 Apr 2025Assigned to an examining attorneyAssigned To Examiner
- 2 Jun 2025Office action issuedNon-Final Action Written
- 19 Aug 2025Response to office action filedTeas Response To Office Action Received
- 20 Jan 2026Final refusal issuedFinal Refusal Mailed
- 11 May 2026Office action issuedNon-Final Action Written
All 29 events
| 2026-08-11 | Application Extension To Response Period - Received |
| 2026-08-11 | Application Extension Granted/Receipt Provided |
| 2026-05-11 | Non-Final Action Written |
| 2026-05-11 | Non-Final Action E-Mailed |
| 2026-05-11 | Notification Of Non-Final Action E-Mailed |
| 2026-04-20 | Examiners Amendment -Written |
| 2026-04-20 | Examiners Amendment E-Mailed |
| 2026-04-20 | Notification Of Examiners Amendment E-Mailed |
| 2026-04-20 | Examiner's Amendment Entered |
| 2026-01-20 | Final Refusal Mailed |
| 2026-01-20 | Final Refusal E-Mailed |
| 2026-01-20 | Notification Of Final Refusal Emailed |
| 2025-08-20 | Teas/Email Correspondence Entered |
| 2025-08-19 | Teas Response To Office Action Received |
| 2025-08-19 | Correspondence Received In Law Office |
| 2025-06-02 | Non-Final Action Written |
| 2025-06-02 | Non-Final Action E-Mailed |
| 2025-06-02 | Notification Of Non-Final Action E-Mailed |
| 2025-05-22 | Teas Change Of Owner Address Received |
| 2025-05-22 | Applicant/Correspondence Changes (Non-Responsive) Entered |
| 2025-05-22 | Teas Change Of Correspondence Received |
| 2025-05-16 | Teas Change Of Owner Address Received |
| 2025-05-16 | Applicant/Correspondence Changes (Non-Responsive) Entered |
| 2025-05-16 | Teas Revoke/App/Change Addr Of Atty/Dom Rep Received |
| 2025-05-16 | Attorney/Dom.rep.revoked And/Or Appointed |
| 2025-05-16 | Teas Change Of Correspondence Received |
| 2025-04-24 | Assigned To Examiner |
| 2024-11-18 | New Application Entered |
| 2024-11-18 | New Application Office Supplied Data Entered |
Goods & services by class
Class 37 Construction & repair
Construction of high-voltage substations, low and medium-voltage controls and distribution, power houses, and switchgear in the electrical, utilities, industrials, renewables, and data center industries; installation of infrastructure for the transmission and distribution of electricity and electrical energy, electrical apparatus, cables, and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; maintenance of infrastructure for the transmission and distribution of electricity and electrical energy, electrical apparatus, cables, and electricity and electrical energy distribution and transmi…
First use anywhere 1 Sep 2022 · First use in commerce 1 Sep 2022
Class 41 Education & entertainment
Educational services, namely, providing training in the fields of infrastructure and equipment engineering, testing, construction, installation, maintenance, and repair in the electrical, utilities, industrials, renewables, and data center industries; Educational services, namely, providing safety training in the fields of infrastructure and equipment engineering, testing, construction, installation, maintenance, and repair in the electrical, utilities, industrials, renewables, and data center industries.
First use anywhere 1 Sep 2022 · First use in commerce 1 Sep 2022
Class 42 Technology & SaaS
Testing, monitoring, and inspection of infrastructure for the transmission and distribution of electricity and electrical energy and electricity and electrical energy distribution and transmission equipment in the electrical, utilities, industrials, renewables, and data center industries; Testing of apparatus in the field of electrical engineering; Scientific testing and analysis in the nature of thermography testing and analysis services, namely, electrical-system testing services of others using thermography; Design, engineering, research, development, consulting, analysis, and testing of infrastructure for the transmission and distribution of electricity and electrical energy and electric…
First use anywhere 1 Sep 2022 · First use in commerce 1 Sep 2022
Owner details
See the official record for contact details. View official record →
Source & freshness
Source: the official United States trademark register. This record was last updated on 11 Aug 2026; the index was built on 20 Nov 2026 and covers data through 31 Aug 2026. View official record → If the two differ, the official record is correct.